A bathroom renovation checklist keeps three things in order: a written brief your tradesperson can price accurately, deliberate product selections made before work starts, and the handover documents you need once the job is finished. Working through each category before engaging a contractor reduces scope disputes, budget blowouts and last-minute substitutions.
Why a written brief matters before any quoting
A verbal description of “a new bathroom” leaves every contractor free to price a different job. A written brief forces you to articulate the scope in enough detail that two separate quotes actually compare the same work.
Your brief should cover:
- Demolition extent – are you stripping to the stud wall or keeping the existing layout and waste positions?
- Layout changes – moving a shower, toilet or vanity requires relocating plumbing. Consumer and Business Services SA advises that for major renovation work such as a new bathroom, you need someone with a builder’s licence that allows them to coordinate the whole process — not just a plumber’s licence alone. Flag any layout changes clearly so the right trades are factored into quotes from the start.
- Structural questions – older Adelaide homes may contain asbestos-containing materials in wall sheeting, floor tiles or adhesives. The SA Government’s asbestos guidance states that it is not possible to find out whether a material contains asbestos simply by looking at it, and that if you suspect a material but are unsure, you should assume it does or have it tested by a NATA-accredited laboratory. If your home was built or renovated before the mid-1980s, include a note in your brief that professional assessment is required before any demolition.
- Ventilation intent – decide whether the existing exhaust fan stays, is upgraded or is repositioned. The Australian Government’s YourHome guide advises venting bathroom exhaust directly outdoors. This detail affects both electrical and building work and should be in your brief, not left to assumption.
- Waterproofing specification – ask what membrane system is proposed and where it will be applied. This is a question for your tradesperson to answer in their scope document; it is worth asking so you can compare quotes on the same basis.
See the small bathroom layout planning guide if you are still finalising your layout before writing the brief.
Licence and contract checks before you sign
The SA Government advises always checking qualifications before you hire someone, and that you can check a contractor is licensed for specific work by asking to see their licence. Before signing anything, the SA Government also advises consumers not to sign a contract unless they read it, understand it, check everything discussed is included, and agree with it — and to ask the builder to explain any unclear terms or seek advice from Consumer and Business Services.
In your contract review, pay particular attention to:
- Prime cost items vs provisional sums – SA Government builder responsibility guidance identifies both as clause types that can appear in building contracts. A prime cost item allows a contractor to charge for items of a higher standard than normally provided; a provisional sum gives an estimate for specific costs whose scope cannot be precisely determined upfront. Both are legitimate, but you should know which allowances appear in your contract and how variations are authorised.
- Payment schedule – understand when each payment is triggered and what completed work it corresponds to.
- Variation process – confirm how out-of-scope work is approved and priced before it proceeds.
For a detailed breakdown of what affects pricing, the bathroom renovation cost guide and how to compare bathroom quotes guide are useful companions to this checklist.
Product selections checklist
Ask suppliers for the current availability of the actual tiles, tapware, vanity and screen, and ask the provider which selections must be confirmed for its proposed programme. The sources used here do not rank the causes of renovation delays.
Work through this list before your start date:
Tiles
- Floor tile (confirm slip rating is appropriate for wet areas — ask your supplier)
- Wall tile for shower recess
- Feature tile or border if applicable
- Grout colour
- Confirm all quantities ordered with contingency for cuts and breakage
Fixtures and fittings
- Toilet suite (wall-faced, back-to-wall or in-wall cistern)
- Vanity and basin (confirm cabinet depth fits your floor plan)
- Tapware — basin, shower and bath if applicable (confirm brand and finish match across items)
- Shower screen or frameless enclosure
- Bath if included
- Towel rails, toilet roll holder and hooks
Lighting and electrical
- Exhaust fan specification (location and ducting route confirmed with your electrician)
- Light fittings rated for bathroom zones — a licensed electrician determines compliance, not a product data sheet alone
- Heated towel rail (hardwired or plug-in; clarify with your electrician)
Hypothetical scenario: Imagine you have selected floor tiles but left the tapware finish as “chrome or brushed nickel, to be decided.” Your contractor orders chrome shower fittings to keep the schedule, and you later choose brushed nickel basin tapware from a different supplier. The homeowner asks what was actually authorised, whether a change is possible and what price or programme effect the provider proposes. The hypothetical does not establish that a variation charge is payable or that changing a selection has no cost.
Managing the construction phase
You do not need to micromanage a licensed contractor, but a few check-in points are reasonable:
- After demolition – inspect for any unexpected substrate conditions such as rot, moisture damage or previous patch repairs before waterproofing proceeds.
- After waterproofing – confirm the membrane is in place before tiling covers it. You cannot see it afterwards.
- Before fixout – walk through with your fixture schedule to confirm everything is on site before tradespeople arrive for final fit-off.
Refer to the bathroom renovation timelines guide for a typical sequencing overview.
Handover documents checklist
Handover is not just a key exchange. At completion, you should receive or confirm:
- Plumbing compliance documentation – ask your plumber what compliance certification or documentation they provide for completed plumbing and drainage work in South Australia.
- Waterproofing documentation – ask what documentation your contractor provides for the waterproofing installation.
- Statements of compliance – the SA Government notes that licensed contractors must issue a statement of compliance for building work that requires approval. Ask your contractor which approvals applied to your project and what documentation you should receive.
- Warranty documents – manufacturer warranties for the vanity, shower screen, tapware and tiles. File these with the certificates above.
- Appliance manuals – exhaust fan, heated towel rail, any in-wall cistern.
- Paint colour codes – for future touch-up matching.
- Spare tiles – request leftover tiles be left with you; matching discontinued tiles years later is difficult.
- Contractor contact details – for any defect queries during the warranty period defined in your contract.
For a more detailed treatment of each handover document, see the bathroom renovation handover checklist.
Ensuite and laundry variations
This checklist applies broadly to any wet area renovation. Ensuites add considerations around spatial efficiency and may warrant a conversation with your contractor about noise transmission if the room is adjacent to a bedroom wall. Laundries add appliance connection points and potentially trough positioning. See the ensuite renovations and laundry renovations service pages for scope-specific details.
Using this checklist well
A checklist does not replace professional advice — it prepares you to have better conversations with the licensed tradespersons who will design solutions, make compliance decisions and carry out the work. Bring your written brief and product selections to your first contractor meeting. Leave technical specifications to the people qualified to determine them.
If you would like a referral to a bathroom renovation contractor in Adelaide where available, you are welcome to submit an enquiry through the bathroom renovations service page.
Further reading and sources
- SA Government – Choosing a building professional
- Consumer and Business Services SA – Always use a licensed plumber
- SA Government – Builder responsibilities
- Asbestos SA – Find and identify asbestos in the home
- Australian Government YourHome – Condensation
Discuss your project
This guide helps prepare questions; it is not a site assessment, design specification or professional approval. Read about bathroom renovations in adelaide before making a project enquiry.